Difference between revisions of "Enoch Pratt Central Library"

From DAS Wiki
Line 9: Line 9:
 
|general_contractor=George A. Fuller Co
 
|general_contractor=George A. Fuller Co
 
|completion_date=January 1934
 
|completion_date=January 1934
|renovation_date=January 1, 2017
+
|renovation_date=2017
 
}}
 
}}
 
The current central library replaced the [[Pratt Library|original building]].
 
The current central library replaced the [[Pratt Library|original building]].
  
 
[[Category: Buildings]]
 
[[Category: Buildings]]

Revision as of 23:39, May 12, 2021

Enoch Pratt Central Library
Central-library-exterior-construction.jpg
Site Information
Address400 Cathedral Street
Geo-reference39°17′40″N 76°37′01″W / 39.29453°N 76.61708°W / 39.29453; -76.61708
OwnerEnoch Pratt Free Library
Building Data
Building TypeLibrary
Design
ArchitectClyde N. Friz
Architecture FirmClyde N & Nelson Friz
Construction
CompletedJanuary 1934
Renovation
Date2017

The current central library replaced the original building.