Difference between revisions of "Enoch Pratt Central Library"
From DAS Wiki
Line 9: | Line 9: | ||
|general_contractor=George A. Fuller Co | |general_contractor=George A. Fuller Co | ||
|completion_date=January 1934 | |completion_date=January 1934 | ||
− | |renovation_date= | + | |renovation_date=2017 |
}} | }} | ||
The current central library replaced the [[Pratt Library|original building]]. | The current central library replaced the [[Pratt Library|original building]]. | ||
[[Category: Buildings]] | [[Category: Buildings]] |
Revision as of 23:39, May 12, 2021
Enoch Pratt Central Library | |
---|---|
Site Information | |
Address | 400 Cathedral Street |
Geo-reference | 39°17′40″N 76°37′01″W / 39.29453°N 76.61708°W |
Owner | Enoch Pratt Free Library |
Building Data | |
Building Type | Library |
Design | |
Architect | Clyde N. Friz |
Architecture Firm | Clyde N & Nelson Friz |
Construction | |
Completed | January 1934 |
Renovation | |
Date | 2017 |
The current central library replaced the original building.