Difference between revisions of "Enoch Pratt Central Library"
From DAS Wiki
m |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
|architect=Clyde N. Friz | |architect=Clyde N. Friz | ||
|architecture_firm=Clyde N & Nelson Friz | |architecture_firm=Clyde N & Nelson Friz | ||
− | | | + | |contractors=George A. Fuller Co |
|completion_date=January 1934 | |completion_date=January 1934 | ||
− | |renovation_date= | + | |renovation_date=2017 |
}} | }} | ||
The current central library replaced the [[Pratt Library|original building]]. | The current central library replaced the [[Pratt Library|original building]]. | ||
− | [[Category: Buildings]] | + | [[Category: Buildings|Pratt Library Central]] |
Latest revision as of 15:35, January 14, 2022
Enoch Pratt Central Library | |
---|---|
Site Information | |
Address | 400 Cathedral Street |
Geo-reference | 39°17′40″N 76°37′01″W / 39.29453°N 76.61708°W |
Owner | Enoch Pratt Free Library |
Building Data | |
Building Type | Library |
Design | |
Architect | Clyde N. Friz |
Architecture Firm | Clyde N & Nelson Friz |
Construction | |
Contractors | |
Completed | January 1934 |
Renovation | |
Date | 2017 |
The current central library replaced the original building.