Difference between revisions of "Enoch Pratt Central Library"
From DAS Wiki
Line 8: | Line 8: | ||
| main_contractor=George A Fuller Co. | | main_contractor=George A Fuller Co. | ||
| renovation_date=2017 | | renovation_date=2017 | ||
− | |mapframe= | + | | mapframe-coordinates={{coord|39|17|40|N|76|37|01|W}} |
}} | }} | ||
The current central library replaced the [[Pratt Library|original building]]. | The current central library replaced the [[Pratt Library|original building]]. |
Revision as of 20:48, April 11, 2021
Lua error in Module:Infobox_mapframe at line 185: attempt to index field 'wikibase' (a nil value). | |
General information | |
---|---|
Address | 400 Cathedral Street, Baltimore |
Coordinates | 39°17′40″N 76°37′01″W / 39.29444°N 76.61694°W |
Completed | 1934 |
Renovated | 2017 |
Design and construction | |
Architect | Clyde N. Friz |
Main contractor | George A Fuller Co. |
The current central library replaced the original building.