Difference between revisions of "Enoch Pratt Central Library"
From DAS Wiki
Line 1: | Line 1: | ||
{{Infobox building | {{Infobox building | ||
| building_name = | | building_name = | ||
− | | image=File:Central-library-exterior-construction.jpg | + | | image = File:Central-library-exterior-construction.jpg |
− | | address=400 Cathedral Street, Baltimore | + | | address = 400 Cathedral Street, Baltimore |
− | | completion_date=1934 | + | | completion_date = 1934 |
− | | architect=[[Clyde N. Friz]] | + | | architect = [[Clyde N. Friz]] |
− | | coordinates={{coord|39|17|40|N|76|37|01|W}} | + | | coordinates = {{coord|39|17|40|N|76|37|01|W}} |
− | | main_contractor=George A Fuller Co. | + | | building_type = Library |
− | | renovation_date=2017 | + | | main_contractor = George A Fuller Co. |
+ | | renovation_date = 2017 | ||
| mapframe = no | | mapframe = no | ||
}} | }} |
Revision as of 22:04, April 11, 2021
General information | |
---|---|
Type | Library |
Address | 400 Cathedral Street, Baltimore |
Coordinates | 39°17′40″N 76°37′01″W / 39.29444°N 76.61694°W |
Completed | 1934 |
Renovated | 2017 |
Design and construction | |
Architect | Clyde N. Friz |
Main contractor | George A Fuller Co. |
The current central library replaced the original building.