Enoch Pratt Central Library
From DAS Wiki
Lua error in Module:Infobox_mapframe at line 185: attempt to index field 'wikibase' (a nil value). | |
General information | |
---|---|
Address | 400 Cathedral Street, Baltimore |
Completed | 1934 |
Renovated | 2017 |
Design and construction | |
Architect | Clyde N. Friz |
Main contractor | George A Fuller Co. |
The current central library replaced the original building.